New concrete wall, as part of the River Ness flood alleviation works, in Inverness. East side of river, between the Waterloo bridge, and the railway bridge.
Away from the centre of town, this cheaper all cast concrete option (with pink colouring) is being used. As opposed to the concrete wall, with sandstone facing walls either side, topped with a sandstone coping. Surprisingly (to me), the opposite side of the river has the more expensive walling.
Comments New comments are not currently accepted on this journal.