spannarama

By spannarama

Bare

Some more prep work on my office today - we took the blind down and sanded down a load of filler from when we first put it up (and left to deal with later).  Tim then went round and filled various holes and scrapes in the walls, ready for painting.  I also went online and ordered some vinyl floor tiles to fill the space left by the old cupboards.  We decided that was enough for today as we were both tired (me especially, after a rubbish sleep).

Comments
Sign in or get an account to comment.