Back to Sandwick today to pressure test and lag the pipework I did on Monday. I realised mid morning that some of the lagging I had been given at the supplier on Monday was the wrong size, meaning a round trip of an hour to collect the correct stuff.
Once all the pipework was lagged, I headed along to the customer's farmhouse to change a radiator. It turned into a nightmare job. They hadn't told me that there had been a fairly significant leak from one of the valves for a long time, but expected me to fix it "while I was there". I eventually got it sorted, but the one hour job had turned into a 3 hour job.
I zoomed home, expecting to spend the evening with my beautiful wife, but I had forgotten she is away on a 24 hour shift at work.