Two dull days..

..both spent digging beds in the tunnel.

I have a large bed to dig over, removing the weeds and stones. At the same time I to line it with plastic to stop the boards getting too wet. And add an extra board below the two already fitted. And dig the paths, throwing the soil onto the beds.

Each task is hindered by the previous one. I can't line with plastic until the weeds are cleared, but clearing the weeds puts soil against the boards I want to cover. I can't nail the lower boards on until the path is cleared of weeds and dug out, which I can't do until the plastic is fitted..

Just got 2 6x4 beds to do now, and a path either side, but now I've run out of boards!

It will get done tomorrow..

Comments
Sign in or get an account to comment.