Putting into place

At unit EC 3 the HP circulationpump had to be exchanged because after 15 years in operation (at intervals) a lot of vibrations and strange noises came out of it....
But it hangs at a difficult place in front of the boiler so the overhead crane cannot reach it. The last part has to be done with a lot of chainblocks.
Here Jan, Erwin and Mickey are putting the pump in proper position.

I had the honour to assist a bit with one of the blocks.

Here in LARGE....

Comments
Sign in or get an account to comment.