Nov 24th, 2013 brick work for the garage
-
Nov 22nd, 2013 ground level frame up
-
Nov 20th, 2013 Concrete poured and set
-
Nov 19th, 2013 pumping concrete into formword
-
Nov 17th, 2013 Slab form work with steel reinforcement
-
Nov 14th, 2013 Pumping water from the trenches
-
Nov 12th, 2013 Trenches ready for slab form work
-
Nov 11th, 2013 Issue with drainage pipe running along the footing
-
Nov 8th, 2013 sewer installation