6th Feb 2014 roof rafts arent straight and valley's not nailed
-
3rd Feb 2014 rail attachments missing
-
1st Feb 2014 battle scars
-
31st Jan 2014 frame inspection, gutters and fasica completed
-
8th Jan 2014 Roof
-
30th Dec 2013 upper level almost there.
-
19th Dec 2013 installing floor joist and yellow tongue
-
12th Dec 2013 steel beams and double brick for the garage is up
-
4th Dec 2013 steel layout and shop drawings