Feb 6th, 2014 roof rafts arent straight and valley's not nailed
-
Feb 3rd, 2014 rail attachments missing
-
Feb 1st, 2014 battle scars
-
Jan 31st, 2014 frame inspection, gutters and fasica completed
-
Jan 8th, 2014 Roof
-
Dec 30th, 2013 upper level almost there.
-
Dec 19th, 2013 installing floor joist and yellow tongue
-
Dec 12th, 2013 steel beams and double brick for the garage is up
-
Dec 4th, 2013 steel layout and shop drawings