Preparations
Preparations are going on for the major overhaul of unit EC 6.
Beside the normal overhead cranes (20 tons and 90/20 tons) we have to use a smaller crane for work at the generator.
This crane can be dismantled and built up at another unit when needed.
Look here for a detail (emergency stop (pushbutton).
When the overhaul starts the area will become restricted, so only people that have to work in that area have admittance.
One year ago.
393
views
- 0
- 0
- Panasonic DMC-FZ28
- 1/33
- f/2.8
- 5mm
- 800
Comments
Sign in or get an account to comment.