Clamp still holding!
Our broken outside tap will be replaced on Friday. Our interim measure to prevent it wasting precious water is still holding. We had some rain today but not the heavy rain we all need. We went to visit our friends in their new house near Cirencester for a lovely lunch. We came home via the massive “missing link” roadworks. When this is completed in 2027 it will link the M5 to the M4 with a continuous dual carriageway.
89
views
- 8
- 0
Comments
Sign in or get an account to comment.