EB
Spent today lifting the old flooring in the bathroom. The had to patch the plywood flooring after the new boiler was fitted earlier this year. Some pipe work was removed leaving holes in the floor. Following that I relaid the old flooring which was still in good condition in our long cupboard.
Ended up without a photo so put together a gift from Richard made from fleece from real sheep and my Herdie hiker a gift from son Stephen.
Sorry no time for commenting at the moment. Hope to catch up soon
Comments
Sign in or get an account to comment.