Wilting (Day 2713)

The plan for the morning was to get the shower tray fitted after building a plinth. As my hand disappeared through one of the floorboards, I realised that my plans would have to change. After a bit of investigation, I decided that there was too much work for me to deal with and I called on a joiner. 
His assessment was that he needs to replace a fairly large section of floor and strengthen the joists, which apparently he can do tomorrow.
I cleared up and headed off to deal with a leaky tap in Tankerness before a slightly early finish for the day. 
Back home with no pics, one of my beautiful wife's slightly wilted flowers filled the blip spot today. 

Comments
Sign in or get an account to comment.