Garden blip (Day 2255)

Back to the bathroom re-fit this morning and I started off with getting the shower screen fitted and getting the enclosure sealed. Next job was to fit the WC and the unit which houses the cistern. Typically, there were no brackets to fix the WC to the floor, meaning a trip into the supplier to get some. When I got back, the customer was busy painting the wall where the towel rail was to be fitted, easier than doing it once the towel rail was on the wall I guess. 
I got the loo all sorted out, then splurged some sealant around the bath before I hung and connected the towel rail. 
A quick tidy up, and my part of the bathroom re-fit was finished. The joiner has a little more to do, but he will be finished this weekend I would think.
Home for a quick catch up with my beautiful wife before she zoomed off to do hoss pedicures, returning later with fish and chips.

Comments
Sign in or get an account to comment.