Harvesting the maize
We had a phone call this morning advising that the contractor was back in town, and they would like to start cutting our maize at 1pm. Here they are with a trailer load about to go off to be dumped in the pit. It was all completed 4 hours later. Boy that combine harvester can move!
Farmerboy and the boys are down at the pit covering it, and dumping all the tyres on it. It's a horrid job - luckily I'm on tea making duties.
123
views
- 9
- 1
- Canon EOS 7D
- 1/5000
- f/10.0
- 55mm
- 6400
Comments
Sign in or get an account to comment.