Double L

By Wyldkatt

The connectors arrived

They arrived this morning. I called the MOT station after work and managed to get an appointment for 9am in the morning - which meant that I spent the next 5 hours cutting, stripping, crimping, soldering, connecting 20 connections (40 wires) on my Yamaha, essentially replacing the 20way connector block between the head loom and the main loom....

Comments
Sign in or get an account to comment.