Kamsar entering Cardiff Bay through the Barrage
After passing through the 40 metre long lock, the boats enter into the 200 hectare bay and proceed to their allocated moorings. The final costs involved in the construction of the three locks were in the hundreds of millions of pounds. Just had an email from Blipfoto telling me that this is my 100th blip. Its quite amazing how quickly that came around!
102
views
- 0
- 0
Comments
Sign in or get an account to comment.