Whoopy.... in HDR
Today the message arrived that unit EC 20 will have to make so- called "jump tests".
For TenneT, the Dutch grid-operator, the unit has to prove that it can respond to a lack of load on the grid with a jump up of a calculated amount of MegaWatts.
The unit is in preservation for almost a year now but in order to keep the right to have access to the grid with her 700 MegaWatts we have to bring her "back to life"...
So: a lot of work to do until the second half of december.
Here is a look at the gas-supply-pipes which are located in the boilerroom.
At the right: two out of three regulating air vessels.
Here in LARGE....
306
views
- 1
- 0
- NIKON D90
- 1/4
- f/5.0
- 28mm
- 1000
Comments
Sign in or get an account to comment.