Bombay High South R

That is the name of the oilfield we are currently working. Bombay High Field is a pretty complicated oilfield. So complicated that even the officials don't know where the exact locations of all pipelines are. It makes the preparation of anchor plans quite difficult if not impossible. On this picture you see the Hermod putting a module on top of the support frame. It looks as if the cranes are entangled in each other but that is part of a higher plan. If you swing with starboard crane to the stern, you have to compensate this with slewing the port crane forward. In this way you prevent unwanted and excessive trim of the Hermod.

Comments
Sign in or get an account to comment.