Project En-suite Bathroom - Day Three
Project En-suite Bathroom - Day Three
Well both the builder and the plumber have worked liked stars today and both have left shattered, although in the picture it doesn't look like a huge difference.
They have spent a lot of time planning and putting pipes in underneath.
It is like a 3-D jigsaw puzzle as the towel radiator's pipes have to be positioned before the shower tray goes in, which also needs its feed putting in place which then leads to something else that has to be done in sequence!
I can't wait to see what'll happen tomorrow.
122
views
- 0
- 0
- Canon EOS 400D DIGITAL
- 1/50
- f/4.0
- 18mm
- 400
Comments
Sign in or get an account to comment.