Progress

In my yesterdays Blip you could see the covered holes and now most of the burners have been put in position.
Each burner consists of several small burners; each of them has to be used (sometimes in combination with each other) according to several load situations of the gasturbine.
In this way the right amount of gas, mixed with air is flowing to the machine in all situations; ensuring as low NOX emission as possible.

So that's the reason there are so many pipes and flixebels are connected to each of the 18 burners.
The yellow thing at the upper side is a 90 tonnes overhead crane.

Here is some more information about the new DLN 2.6 for frame 9FA machines.

It's a beautiful rather quiet morning so we had the time to take a look at the roof of the boilerroom of unit EC 4.

Here in LARGE...

Comments
Sign in or get an account to comment.