Chaos....

The work at unit EC 3 is almost finished.
Over here at the turbine blowdownpipe it's still a bit chaos; some valves have to be adjusted and some things have to be isolated. Not a real nice place to be....
The turbine blowdownpipe is used to drain the steamlines to the turbine at startup when te quality of the steam is not good enough to lead it to the turbine.
In the same time the lines and shut- and regulating valves of the turbine are heated up in this way according to a gradient curve.

Comments
Sign in or get an account to comment.