Demolition work at London Bridge - Part 4
Eighteen days since the last blip of this building and height is diminished.
The crane in the background is the being used for the construction of The Shard.
Previous images:
31 January 2010
18 March 2010
25 April 2010
Comments
Sign in or get an account to comment.