New flooring going down
Proper hardwood wood (engineered floor) going down in the apartment.
Very slow going though, usually after 2.5 hours I could have laid 200sqft of the vinyl plank we use. Reckon I managed to lay maybe 30sqft. Tomorrow is going to be a long day.
Every piece needs to be glued by hand which is slightly time consuming.
34
views
- 0
- 0
- Canon PowerShot A1300
- 1/20
- f/2.8
- 5mm
- 800
Comments
Sign in or get an account to comment.