It's the season

At this time of year, in Malawi, the water tables are lower and its the time to begin pump installation.

Alepher writes:

DATE:30/09/2014
PUMP INSTALLATION

• The pump team made slabs and installed one pump and the following are the details.
Area:DOROBA
Well depth:2.80m
Pump depth:2.60m
GPS: S11 23.573
E033 58.929
No of people:198

Comments
Sign in or get an account to comment.