Next project -

This is the first stage of a new well liner about to be lowered into position. There will be another 140 ft welded to this in sections as it is lowered. The lifting rig was an earlier project specially for this job. The final weight of this liner is 3,5 Te. When this is finished the process is repeated 3M back for a second well.