FINALLY -

The last 8 pieces are ready for loading onto this 60 ft trailor and delivering. During the last month I have moved and turned and rolled 14 of these pieces at least 10 times each in the process of assembly. I reckon I have moved at least 200 tonne single handed with a forklift. On one day alone I climbed on and off the forklift at least 100 times just fitting and removing slings and moving and positioning timber packers. Not sorry to see it finished. The light in the tunnel has just dimmed. The customer has just told me he may want some assistance in putting this building up. In his speak that means he wants to give me the job. The finished building is 12,000 sq ft and nearly 40 ft high. Just for a bonus it will stand under the 132,000 volt national super grid and that has a safety limit of 10 M from the cables. I love his confidence but there must be easier jobs out there.