point and press

By crispinhj

big

gap

Fortunately sorted by adjusting the feet at the front of the unit

Yesterday and today have gone better than I had hoped. We'd programmed the work into two or three hour blocks from 6.30 in the morning to about 8.00 in the evening. Apart from the lack of space and everyone wanting to put their gear down in the middle of that cramped area we've amazingly not really encountered any problems

By three the biggest job was to decorate so we pretty much left them to it, just the hoarding to remove in the morning and a thorough clean.