Cccold

40 meters up at the emergency stack (fluegas-outlet) of the gasturbine of unit EC20.
There are problems with the valves in this stack, we have to operate them manually during start-up of the unit and that's not so nice when the cold wind is blowing and snow is falling.
The valves have the dimensions of a small truck and are not so easy to move so when the unit is stopped on sunday we call maintenance to solve the electrical problems. A tent is built from scaffolding material to make thing a bit better for them.

Here we are at the seaside and looking in southern direction. On the left is the fluegas-outlet (the round duct) of the gasturbine. On the right is the boillerroom of EC 20. Also on the right (white building) the boilerrooms of the units EC 3 till 7

Here is a view of the actuators of the valves when they gave trouble a few months ago....

Comments
Sign in or get an account to comment.