Another ongoing project. This is to re-line two 42" wells. It was born three years ago. Two years ago we bought 84M of 16" stainless pipe. 12 months ago we had the perforated sections rolled and I assembled the piece you see here, 11M long. This was at site with its partner, 9 months ago. The piece you see was lowered into this position with the lifting rig 3 months ago. Now all I have to do is weld 42M of pipe in 6M sections to it and lower it 53M into the ground, all 3 1/2 tones of it, twice. One day before I retire. Yes, it is the same person with the van.
All iPhone. Levels in snap seed.