The final countdown
Such an optimistic design for the poster, as if we can't wait. Truth is we have been waiting since the summer of 2007 and they've recently announced that the only route they are doing now, from the airport to the city centre, will be 8 minutes slower than the shuttle bus. The interest alone will cost us £228 million on the 30 year loan the city had to take out when the cost went from £375 million to over £1 billion. Still, what else could the city have done with that money? probably waste it on keeping libraries open or some such nonsense.
Phew, feel better after that.
Now, have to fill in some insurance forms and read through all the notes I took today interviewing very important folk.
Comments
Sign in or get an account to comment.