Showery.........
.............. inside and outside.
The plumber finished on Friday and the shower room is almost finished. Hubby has just to lay the floor.
However, it is a digitally controlled shower. Hubby decided to alter the clock on it this morning and now we have to sit the switch next to the control box to get it to work! I think the instruction manual will need to be read.
Hubby has just nipped into Stirling to have his hand x-rayed. He injured his finger at karate the last time he was home and it is still giving him bother so the doctor has sent him for an x-ray. He has also got a problem with his eye. It has swollen and is uncomfortable. The doctor can't see any problem with it but we think we may have narrowed it down to a change of shampoo.
It never rains............
Comments
Sign in or get an account to comment.