Waterfoot Sunrise

By alasdairb

Laying it in the Line

Day 10 of the Manchester project and I am still stuck in the toilet!
When son, in his usual methodical way, set up the project spreadsheet he set aside 3 days to complete the bathroom. Well seen he has never done any serious DIY before as we are now on day 7! Today I started the tiling, a job I quite enjoy doing. However, with nothing either vertical or horizontal being level, the frustration quickly set in. After a 11 hour shift this was the state of play. Keep thinking I can see some light at the end of thetunnel only for my optimism to be shattered once by the position of a little bubble of air in the spirit level!

Comments
Sign in or get an account to comment.