Road Lines.

I stood and watched for 5 minutes, never realized how low tech some aspects of this job are. One man drags a 3" high 2 box metal template (one sets the distance from the kerb & the other the width of the line) along the kerb while the other follows pouring the hot paint into the line box from a big bucket.

Comments
Sign in or get an account to comment.