Road Lines.
I stood and watched for 5 minutes, never realized how low tech some aspects of this job are. One man drags a 3" high 2 box metal template (one sets the distance from the kerb & the other the width of the line) along the kerb while the other follows pouring the hot paint into the line box from a big bucket.
185
views
- 0
- 0
- Panasonic DMC-FZ28
- 1/100
- f/3.6
- 12mm
- 100
Comments
Sign in or get an account to comment.