Tramline works
Wet mizzly mist first thing; the day dried up somewhat as it went on but stayed overcast.
Blip is the crew working on the tramlines at the switch point on York Place.
Out later to walk down through Stockbridge and back by George V park. There is now a 'cyclist diversion' signposted through the playpark area while the works continue on the main path between the Eyre Place entrance and the Rodney Street tunnel.
Another useful conversation in the evening with the people who own the flat above us.
Comments
Sign in or get an account to comment.