Moving Muck
Rotovator out again tonight, break it up, rake it out, break it up again.
It's going to be quite a struggle to flatten the slope ready for turf. Need to get the basic levels sorted out before we build the retaining wall.
Think I must have moved about 3 tonnes of earth tonight and it's still not level.
Comments
Sign in or get an account to comment.