McTumshie

By McTumshie

Cleaned Up

The two check valves got removed from No.10's boiler and cleaned up today. A lot of scraping and wire brushing was required to remove the sealant and stuck jointing material. These are the valves through which water gets fed into the boiler.
Doon Valley Railway
Waterside, Ayrshire

Comments
Sign in or get an account to comment.