2108
Hot wire carving tonight.
Mr P is finishing off the plywood structure at the other end of the layout tonight while I start to carve the polystyrene at this end to create the basic shape of the landscape.
Things are really starting to look different as the 2D layout starts to come 3D.
The extra shows the view of the tunnel mouth along the track from under the road bridge.
Comments
Sign in or get an account to comment.