Incoming! (Day 3383)
Back to the bathroom refit this morning and I surprised myself by getting the majority of the bathroom re-sheeted with plasterboard much more quickly than I had expected.
Next on the list was drilling a new hole in the cast iron soil pipe for the connection for the shower waste. It took longer to drill the hole than it did to plasterboard the bathroom, and I gave up before it was finished having run out of time for the day. Hopefully it won't take long in the morning.
A brief stop at home then my beautiful wife and I headed across to Mum's for an evening of puppy sitting. The pup is a furry bundle of mischief, and Sigyn is not particularly impressed by it.
Comments
Sign in or get an account to comment.