Pond Kit
The timber we ordered for building the sides of the new pond arrived today. Thankfully the rain had stopped as we had to carry all 34 lengths up to the top of our drive to allow our neighbours access to their driveway. It was warm work.
The timber we ordered for building the sides of the new pond arrived today. Thankfully the rain had stopped as we had to carry all 34 lengths up to the top of our drive to allow our neighbours access to their driveway. It was warm work.
Comments
Sign in or get an account to comment.