04/04/2024_A bad workman…
Always blames her tools.
Water butt 1of 4 in its new place and ready to collect water from the shed roof again.
Fitting the overflow link pipe was trickier – I measured the pipe accurately – 24mm but forgot to allow for the thread so I needed to use a sharp knife to “tweak”.
I’ve ordered a 25mm holesaw to do the remaining holes to link all 4!
Comments
Sign in or get an account to comment.