R4T

By R4T

Men at work

For some time these workers have been supposed to take down the footbridge as it is rusty and in need of repair.   The town is split into two as the road is closed.   From what we can see they have installed 2 new signals.  The road has been closed for well over a week, with no sign of reopening, such a nuisance.

Comments
Sign in or get an account to comment.