Renovations - Day Four

Home late, so no chance to blip before Saturday... however progress has continued at a pace. The new bathroom window from outside, with associated groundwork.

Other activity:
Inside the new bathroom, plastered ceiling, wall around the window and new framework up for the boxed pipework sections - which will house re-routed gas supply, waste pipes, water and boiler pipe work; Outside concrete poured for the Shed floor; shed flat packed in the back garden awaiting erection; concrete poured round the waste pipe junction box; and some dramatic gardening with all of the shrubs removed from the front garden, to make way for the new driveway, and the first of the shrubs removed from around the old brick shed - prior to demolition.

No work today or tomorrow - so now to clean up at least some of the dust!