Framed
The driveway section that was removed was filled with concrete today. Here we see Rick, the owner of Grade Line, Inc. , framed by two pylons. He works just as hard as his employees. This will probably be the last of these photos. (I hear distant clapping). All that's left is to put down top soil and grass seed or sod.
Today Rick told me that the storm sewers will help with typical rains, but not when we get 500-year floods as we sometimes do. :(
Thank you to Nickimags888 for hosting the mono challenge this month.
Comments
Sign in or get an account to comment.