Tight squeeze
This cargo vessel is arriving to be moored in the Bentinck Dock, it has to pass through a narrow channel and the bridge with its section of road swings round to allow passage.There's very little space either side - about half a metre I would guess. You can see from the Plimsoll line that she is unladen so I have to guess at the cargo, grain or scrap metal.
The extra shows the swing bridge almost back in position to allow road traffic through.
Comments
Sign in or get an account to comment.