Groundworks underway around the new Elective Care Centre for NHS Highland.
On plan the building is a large "Y" shape. There are 81 solar panels on the roof here, the only section suitable for such use. As they're covering less than a sixth of the total roof space, the building isn't a great design in that respect. Likewise all the buildings on the campus... and that's before considering all the farmland lost to concrete and tarmac. Very much more of this to come, with housing etc. planned to cover the other nearby farms.
Comments New comments are not currently accepted on this journal.