Yellow and blue (Day 2680)
An early start for a trip to town to collect plasterboard and timber for the shower room re-fit, then off to Stromness to crack on with the job. R&Z arrived a bit later and sorted out the cable I needed altered before I could get the plasterboarding done. I was held up a bit more by having to spend a while re-building the wooden framing for the plasterboard. It was near enough an inch off vertical from top to bottom.
All the plasterboarding was done by mid-afternoon and I headed to town to collect stuff for tomorrow.
No pics today so a snap of one of my beautiful wife's flowers.
Comments
Sign in or get an account to comment.