And The Best Goes On..
Work continues on the access ramps to the patio. Initially laying soldier courses on concrete bed down each edge of the ramps and landings. These edge courses then give a good guide for a notched out screed board to create the sand bed for the block paving. In the foreground the linear channel drain will give a strong border at the start of the ramp.
202
views
- 0
- 0
- Samsung SM-A125F
- 1/400
- f/2.0
- 5mm
- 25
Comments
Sign in or get an account to comment.