Most of a Patio

Well, the sod is all up and the ground below is leveled and smoothed. So today we started putting down the pavers. Each one is 16" by 16" and went 2 /3 eds 0f the way through the original stack. Next the support poles for the roof must be set before any more pavers can go down. And I don't even have the posts yet. Much, much more to do.

Comments
Sign in or get an account to comment.