Sparkling...
Grinding at the safety valve at the reheater outlet of unit EC 5 which is in overhaul.
There were three men under that pipe, one was grinding, two were watching and checking him...
Chainblocks are holding the pipe in position.
The top of the casing of the valve has been covered to prevent things from falling in.
Working at various systems at boiler and cooling water and: a new control system will be fitted, like the one that's working at unit EC7.
Better in LARGE....
353
views
- 1
- 0
- Nikon D90
- 1/14
- f/5.3
- 90mm
- 1000
Comments
Sign in or get an account to comment.