One Step at a Time

By thepoacher

Chasewater

This is Chasewater Reservoir which was drained in 2010. The 'plug' was replaced in October 2011 and it was not expected to be full until Summer 2013. The chap on the bridge is about to witness the water going into the over-spill six months sooner than expected

Comments
Sign in or get an account to comment.